PROJECTS

PROJECTS

Skip Navigation Links.
Venezuela’s Dobokoubi Heavy Crude Oil Block Development Project
Venezuela’s Dobokoubi Heavy Crude Oil Block Development Project

  Venezuela’s Dobokoubi Heavy Crude Oil Block Development Project

Dobokoubi heavy crude oil block which is located in the Eastern region of Venezuela in Anzoategui Province in East-South of El Tigre city in the Northern section of Orinoco Oil Belt, measures 353 Km2 in area. This Block holds heavy crude oil of API 12 which may be produced only upon adding of diluters. This Block is expected to produce approximately 344 billion barrels of oil.

Petropars has made a Participation Agreement with Venezuela’s National Oil Company (PDVSA), in conformity with which studies will be performed by Petropars on this Block in order to increase the heavy oil (API) production from Dobokoubi Heavy Crude Oil Block from 11,000 barrels per day (b/d) to a maximum of 38,000 (b/d) upon drilling of 224 wells and initial separation of water from oil in the onshore facilities. Subsequently, diluters will be added so as to transfer the gas to a location as specified by Venezuela’s National Oil Company (PDVSA). After completion of Petropars studies on this field, Venezuela Oil Proved reserved has been increased which has been approved by International Agencies.

 

Project Name:

Increasing the Storage and Dispatch Capacity of TAECJAA

Location:

Jose export terminal, Anzoategui Province,Venezuela

Client:

PETRÓLEOS DE VENEZUELA, S.A. (PDVSA)

Contract Type:

EPC-Lump sum

Start date:

30-Jan-2024

Target:

• Increasing loading capacity by 200 thousand barrels per hour

• Increasing storage capacity by 1.2 million barrels (crude oil and condensate)

• Recovery of transmission capacity (pumping) at the rate of 270 thousand barrels per hour

Scope of Work:

• Description of Venezuela: Repair of 8 loading arms with a capacity of 25,000 barrels per hour each

• Reconstruction of 1 storage tank of 500 thousand barrels and repair of 2 storage tanks of 350 thousand barrels

• Repair and overhaul of the western pumping station consisting of 14 electric pumps with a total capacity of 210 thousand barrels per hour

• Repair and overhaul of the eastern pumping station consisting of 13 electric pumps with a total capacity of 60 thousand barrels per hour

Picture