PROJECTS

PROJECTS

Skip Navigation Links.
Construction project of Dry Phase1٫ South Pars Facility

  Construction project of Dry Phase1٫ South Pars Facility

Contract for the implementation of the phase development plan1٫ South Pars Gas Field by Pars Oil and Gas Company on behalf of the National Iranian Oil Company as the employer of the

Contract for the implementation of the phase development plan1٫ South Pars Gas Field by Pars Oil and Gas Company on behalf of the National Iranian Oil Company as the employer of the plan، To the consortium of  Petropars Limitd (consortium leader), Petropars of Iran and Iran Marine Engineering and Manufacturing Company in 2 Khordad ۱۳. The location of the project is located in the Tombak area and about 210 km southeast of Bushehr port and with an area of about 218/5 hectares, between gas refineries Phases 11 and 12 South Pars. Currently, the project is a 5/99 percent physical development for 3 years, which is in the stage of commercial production, punching and closing of the following treaties.

The most important achievements of Phase 1٫ Project:

Management of all EPC stages by Petropars and domestic specialist forces, activity of more than 15,000 people at the peak of work, management of more than 1,200 internal and external contracts

Full launch of three a lot of  gas in less than five months

Achieving early production in less than 70 months using reservoir gas during international sanctions

Record in paying workers' salaries and preventing labor tensions in payments

safety badge reception

Record in QC and environmental issues (including the early launch of Unit 129 for industrial wastewater treatment)

employment of more than 162 million people internal power clock in phase 19 plan

Installation of 55 thousand tons of metal structure

Installation of 40 thousand tons of fixed and rotary equipment

about 3 million inches diameter of pipe

About 7,200 km of electrical cable and precision instruments

Picture